Bowling Green Stadium - Before Work
Bowling Green State University
Doyt Perry Synthetic Turf, 2007
Fastest and safest turf in the M.A.C. Designed placement of 11,000 sq yds FieldTurf “DuroSpine”
monofilament synthetic grass system and 11,000 yards of geotextile separation fabric over 2,400 cu yds aggregate base with
6,200 linear feet of subgrade drainage. Services included site survey, line marking, dimensioning and on-site placement
and quantity check. Project budget $1.15 M.
Bowling Green Stadium - After Work
Bowling Green State University
Doyt Perry Synthetic Turf, 2007
Fastest and safest turf in the M.A.C. Designed placement of 11,000 sq yds FieldTurf
“DuroSpine” monofilament synthetic grass system and 11,000 yards of geotextile separation
fabric over 2,400 cu yds aggregate base with 6,200 linear feet of subgrade drainage.
Services included site survey, line marking, dimensioning and on-site placement and quantity
check. Project budget $1.15 M.
University of Toledo
NCAA Competition Tennis Courts, 2005
Rehabilitation of existing 37,500 sq ft. varsity courts, Design of asphalt mix for leveling
and surface course and acrylic playing surface, drainage improvements to address frost heave
at perimeter fence and net sleeves. Courts to meet USTA and NCAA compliance.
Project Cost $103 K.
University of Toledo
NCAA Competition Running Track, 2005
Lewandowski Engineers teamed with H.O.K. Sports of Kansas Ciy, Mo. And Paige Design of Bahama,
Nc., for rehabilitation of existing 44,850 sq ft running track and 104,732 sq ft infield.
Services include demolition specifications for synthetic surface and asphalt base course.
Design of leveling and wear course, underdrain improvements, curbing, safety fence and field
events areas.
University of Toledo
NCAA Competition Soccer Field, 2004
Paige Design, H.O.K. Sports and Lewandowski Engineers joined to design the varsity soccer
field improvements. Services included site survey, facility evaluation and new drainage
infrastructure, quantity take-off, cost estimate and construction supervision.
|
|
Bowling Green State University
NCAA Competition Tennis Courts, 2007
Survey, design and construction supervision of BGSU’s varsity competition tennis courts.
Services include pavement and drainage design, line marking, dimensioning, erosion control and USTA and NCAA compliance.
Project cost $400k
Bowling Green State University - Before and After
Bowling Green Stadium - Before Work
Bowling Green Stadium - After Work
Bowling Green Stadium - Before Work
Bowling Green Stadium - After Work
|