ALTA SURVEYS

REGISTRATIONS
   
     
Bowling Green Stadium - Before Work

Bowling Green State University

Doyt Perry Synthetic Turf, 2007

Fastest and safest turf in the M.A.C. Designed placement of 11,000 sq yds FieldTurf “DuroSpine” monofilament synthetic grass system and 11,000 yards of geotextile separation fabric over 2,400 cu yds aggregate base with 6,200 linear feet of subgrade drainage. Services included site survey, line marking, dimensioning and on-site placement and quantity check. Project budget $1.15 M.

Bowling Green Stadium - After Work

Bowling Green State University

Doyt Perry Synthetic Turf, 2007

Fastest and safest turf in the M.A.C. Designed placement of 11,000 sq yds FieldTurf “DuroSpine” monofilament synthetic grass system and 11,000 yards of geotextile separation fabric over 2,400 cu yds aggregate base with 6,200 linear feet of subgrade drainage. Services included site survey, line marking, dimensioning and on-site placement and quantity check. Project budget $1.15 M.   

University of Toledo

NCAA Competition Tennis Courts, 2005

Rehabilitation of existing 37,500 sq ft. varsity courts, Design of asphalt mix for leveling and surface course and acrylic playing surface, drainage improvements to address frost heave at perimeter fence and net sleeves. Courts to meet USTA and NCAA compliance. Project Cost $103 K.

University of Toledo

NCAA Competition Running Track, 2005

Lewandowski Engineers teamed with H.O.K. Sports of Kansas Ciy, Mo. And Paige Design of Bahama, Nc., for rehabilitation of existing 44,850 sq ft running track and 104,732 sq ft infield. Services include demolition specifications for synthetic surface and asphalt base course. Design of leveling and wear course, underdrain improvements, curbing, safety fence and field events areas.

University of Toledo

NCAA Competition Soccer Field, 2004

Paige Design, H.O.K. Sports and Lewandowski Engineers joined to design the varsity soccer field improvements. Services included site survey, facility evaluation and new drainage infrastructure, quantity take-off, cost estimate and construction supervision.

 

Bowling Green State University

NCAA Competition Tennis Courts, 2007

Survey, design and construction supervision of BGSU’s varsity competition tennis courts. Services include pavement and drainage design, line marking, dimensioning, erosion control and USTA and NCAA compliance. Project cost $400k

Bowling Green State University - Before and After

Bowling Green Stadium - Before Work

Bowling Green Stadium - After Work

Bowling Green Stadium - Before Work

Bowling Green Stadium - After Work

 

   
© Copyright 2011 Lewandowski Engineers All Rights Reserved